Reference detail

Pilsen University Hospital – building a parking lot

Ivenstor
GEOSAN GROUP a.s.
Type
Industrial construction
Realization date
may 2017 - october 2017
Budget
8 170 000 Kč
Place
Plzeň

COBAP s.r.o. for GEOSAN GROUP a.s. work consisting in the complete supply of heavy-current installations consisting of connecting the parking space of the transformer station to the main switchboard, installing the socket distribution, installing the distribution and lighting elements inside and outside, installation of emergency lighting and lighting elements, installation of electrical floor heating, distribution for HVAC, systems, lightning protection, LN relaying, including earthworks related to the execution of the work; complete supply of low-voltage installations consisting of electrical installations and elements of fire-fighting system (EPS), CCTV camera systems and distribution system components, distribution systems and components of the parking system, distributions and elements of the gas detection system and combustible mixtures. The work was mainly on weekends so that the realization had the least impact on the operation of the hospital. For these reasons, the order was relatively demanding for coordination, yet we handed the work in the required quality and deadline.