Reference detail

Plzeňský prazdroj a.s.

Ivenstor
PVP and PET Plzeň
Type
Industrial construction
Realization date
april 2012 - may 2012
Budget
2 500 000 Kč
Place
Velké Popovice

Under the terms of the lighting reconstruction of three Brewery Velké Popovice warehouses and bottling line for PET bottles in the brewery a control of lighting fixtures, incuding their delivery, was designed and implemented. The works were performed during the full operation production at night time and were carried out with an emphasis on a minimum limitation of the operation of the buildings around. During the trial operation an optimizatopm of the switching times lenght of individual sections according to the investor’s requirements was set up and after checking of the trouble-free functioning of the entire system the work was returned back into the full operation.